Dundee House, New Council Headquarters, Dundee

Client

Dundee Council

Main Contractor

Bovis Lend Lease

Architect Reiach & Hall
Engineer Buro Happold

Contract Period

44 weeks

Project Value

£6 million

Scope of Works Sub and Superstructure Package including basement works, below slab drainage waterproofing and ground floor slab, Superstructure entails a 7 story concrete frame with 6 concrete cores, the majority of the concrete frame is exposed and therefore of a premium standard. The new building also incorporates an existing tenement façade and associated ties into this

 

 

Retail Park, Stenhousemuir, Block A Site

Client

McDonald Estates

Main Contractor

DBCE

Architect Fouin & Bell
Engineer Struer

Contract Period

20 weeks

Project Value

£900,000

Scope of Works Construction of a 1200m2 Retail Unit Shell split internally into 4 units, curtain walling to three elevations of the building including glass doors. The main roof is constructed from kingspan RW panels and the mansard roof is a standing seam rigidal sheeted roof with 4 feature helipad roofs. External hard landscaping includes a car park, monoblock bays and tar road with pedestrian areas in monoblock and paving

 

 

Bolton Community College, Lancashire

Client

Bolton College

Main Contractor

BAM North West

Architect Taylor Young
Engineer Gifford LLP

Contract Period

35 weeks

Project Value

£6 million

Scope of Works Two separate college buildings both comprising of sub and superstructure works including drainage c/w a large attenuation system, groundworks, retaining walls ground bearing slabs c/w gas membrane. The community college building superstructure consists of a 4 storey concrete frame with exposed high quality concrete finishes, the 6th form college is a structural steel frame with a feature twin level concrete rotunda. To facilitate construction 3 Tower Cranes and a static placing boom are being utilised

 

 

Easterbush Research Centre , Edinburgh

Client

Edinburgh University

Main Contractor

BAM Construction Ltd

Architect CUH2A
Engineer Faber Maunsell

Contract Period

36 weeks

Project Value

£5.7 million

Scope of Works

Substructure including Waterproof Basement, Pile Caps and Retaining Walls, 3 Storey Superstructure Concrete Frame in P.T. Slabs and Precast Columns with 2 Tower Cranes

 

 

Biomedical Research Facility, Strathclyde University, Glasgow

Client

Strathclyde University

Main Contractor

BAM

Architect Sheppard Robson
Engineer Buro Happold

Contract Period

32 weeks

Project Value

£3.8 million

Scope of Works Substructure works including Pile Caps and Ground Beams together with Ground Floor Slab Construction. Superstructure includes all Verticle Columns & Walls with various levels of Traditionally Reinforced Concrete Slabs

 

 

Westport, Edinburgh

Client

Oakbraid Ltd

Main Contractor

Miller Construction

Architect Michael Laird
Engineer Blyth & Blyth

Contract Period

44 weeks

Project Value

£3.4 million

Scope of Works Design and Scheduling of Rebar Reinforcement, Bulk Excavation, Removal and Disposal of 12,000 cube of Contaminated Waste, Substructure and Superstructure package including Underground Car Park, Internal Drainage and External Works, 8 Storey Post Tensioned Concrete Frame including RC Stair Cores and Pre-cast Stairs

 

 

 

Head Office: Dunne Group Ltd, Inchmuir Road, Whitehill Industrial Estate, Bathgate, EH48 2EW Phone: +44 (0)1506 657777 Fax: +44 (0)1506 657770
Regional Office: Dunne Group Ltd, 4205 Park Approach, Thorpe Park, Leeds, LS15 8GB Phone: +44 (0)1132 840540 Fax: +44 (0)1132 840541
Regional Office: Dunne Group Ltd, Leigh Commerce Park, Greenfold Way, Leigh, Greater Manchester WN7 3XH Phone: +44 (0)1942 267470 Fax: +44 (0)1942 267471
©2010 Dunne Group Limited All Rights Reserved