Southern General Hospital, Glasgow

Client

NHS

Main Contractor

Brookfield Construction UK

Architect Boswell, Mitchell & Johnston
Engineer URS

Contract Period

53 weeks

Project Value

£13 million

Scope of Works

Bulk excavation, Sheet Piling, Reinforced Substructure and Four floors of Upper Reinforced Superstructure incorporating Precast Columns covering an area of 21,000m2.

 

 

University of the West of Scotland, Ayr Campus

Client

University of the West of Scotland

Main Contractor

Bovis Lend Lease

Architect RMJM
Engineer Woolgar Hunter

Contract Period

39 weeks

Project Value

£7 million

Scope of Works Bulk excavation of 24,500m3, Concrete Substructure, Single Storey Basement, 3 Storey Post Tensioned Superstructure, 18,000m2 Building Footprint with associated External and Internal Drainage.

 

 

Dundee House, New Council Headquarters, Dundee

Client

Dundee Council

Main Contractor

Bovis Lend Lease

Architect Reiach & Hall
Engineer Buro Happold

Contract Period

44 weeks

Project Value

£6 million

Scope of Works Sub and Superstructure Package including basement works, below slab drainage waterproofing and ground floor slab, Superstructure entails a 7 story concrete frame with 6 concrete cores, the majority of the concrete frame is exposed and therefore of a premium standard. The new building also incorporates an existing tenement façade and associated ties into this

 

 

Bolton Community College, Lancashire

Client

Bolton College

Main Contractor

BAM North West

Architect Taylor Young
Engineer Gifford LLP

Contract Period

35 weeks

Project Value

£6 million

Scope of Works Two separate college buildings both comprising of sub and superstructure works including drainage c/w a large attenuation system, groundworks, retaining walls ground bearing slabs c/w gas membrane. The community college building superstructure consists of a 4 storey concrete frame with exposed high quality concrete finishes, the 6th form college is a structural steel frame with a feature twin level concrete rotunda. To facilitate construction 3 Tower Cranes and a static placing boom are being utilised

 

 

Easterbush Research Centre , Edinburgh

Client

Edinburgh University

Main Contractor

BAM Construction Ltd

Architect CUH2A
Engineer Faber Maunsell

Contract Period

36 weeks

Project Value

£5.7 million

Scope of Works

Substructure including Waterproof Basement, Pile Caps and Retaining Walls, 3 Storey Superstructure Concrete Frame in P.T. Slabs and Precast Columns with 2 Tower Cranes

 

 

1 | 2 | 3 | 4 | 5 Next

 

Head Office: Dunne Group Ltd, Inchmuir Road, Whitehill Industrial Estate, Bathgate, EH48 2EW Phone: +44 (0)1506 657777 Fax: +44 (0)1506 657770
Regional Office: Dunne Group Ltd, 4205 Park Approach, Thorpe Park, Leeds, LS15 8GB Phone: +44 (0)1132 840540 Fax: +44 (0)1132 840541
Regional Office: Dunne Group Ltd, Leigh Commerce Park, Greenfold Way, Leigh, Greater Manchester WN7 3XH Phone: +44 (0)1942 267470 Fax: +44 (0)1942 267471
©2012 Dunne Group Limited All Rights Reserved